Special project to renovate an existing building, to be safe and usable as a library, and add solar lighting -- important additions for the school community (Sept. 7-30, 2025).
September 7: We have begun mobilizing materials for the renovation of the school's mini library.
Delivery of sand to the site.
Off loading cement on the site.
September 12: Mobilization continues. Some workers are focused on block making, others are busy with steel bending. Today the team also began erecting the pillar positions.
Block making going on.
Steel bending.
This is how the former pillars (that need to be replaced to make structure safe) look like in the buildings.
This is where we stopped today.
This is what the town looks like during the rainy season. The down part here.
The upper part of town.
The center part of the town.
This is the center of the town on the right.
September 13: Formwork for the front pillars was set up and concreting of the pillars successfully completed.
Mixing of the concrete.
The existing roofing being taken off in preparation for the next stage.